Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Arditi, D and Balci, G (2009) Managerial Competencies of Female and Male Construction Managers. Journal of Construction Engineering and Management, 135(11), 1275–8.

Cable, J K, Jaselskis, E J, Walters, R C, Li, L and Bauer, C R (2009) Stringless Portland Cement Concrete Paving. Journal of Construction Engineering and Management, 135(11), 1253–60.

Caerteling, J S, Halman, J I M, Song, M and Dorée, A G (2009) Impact of Government and Corporate Strategy on the Performance of Technology Projects in Road Construction. Journal of Construction Engineering and Management, 135(11), 1211–21.

Chan, A P C, Chan, D W M and Yeung, J F Y (2009) Overview of the Application of “Fuzzy Techniques” in Construction Management Research. Journal of Construction Engineering and Management, 135(11), 1241–52.

Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2009) Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), 1115–24.

Chen, C and Orr, R J (2009) Chinese Contractors in Africa: Home Government Support, Coordination Mechanisms, and Market Entry Strategies. Journal of Construction Engineering and Management, 135(11), 1201–10.

Chen, H L (2009) Model for Predicting Financial Performance of Development and Construction Corporations. Journal of Construction Engineering and Management, 135(11), 1190–200.

El-Rayes, K and Jun, D H (2009) Optimizing Resource Leveling in Construction Projects. Journal of Construction Engineering and Management, 135(11), 1172–80.

  • Type: Journal Article
  • Keywords: Resource management; Leveling; Scheduling; Labor; Optimization; Computer models; Construction management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000097
  • Abstract:
    Construction schedules, generated by network scheduling techniques, often cause undesirable resource fluctuations that are impractical, inefficient, and costly to implement on construction sites. This paper presents the development of two innovative resource leveling metrics to directly measure and minimize the negative impact of resource fluctuations on construction productivity and cost. The first metric quantifies the total amount of resources that need to be temporarily released during low demand periods and rehired at a later stage during high demand periods. The second measures the total number of idle and nonproductive resource days that are caused by undesirable resource fluctuations. The two new metrics are incorporated in a robust and practical optimization model that is capable of generating optimal and practical schedules that maximize the efficiency of resource utilization. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities. The results of this analysis show that the present model and metrics are capable of outperforming existing metrics and eliminating undesirable resource fluctuations and resource idle time.

Goh, Y M and Chua, D K H (2009) Case-Based Reasoning for Construction Hazard Identification: Case Representation and Retrieval. Journal of Construction Engineering and Management, 135(11), 1181–9.

Gransberg, D D and Riemer, C (2009) Impact of Inaccurate Engineer’s Estimated Quantities on Unit Price Contracts. Journal of Construction Engineering and Management, 135(11), 1138–45.

Lee, H, Seo, J, Park, M, Ryu, H and Kwon, S (2009) Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type. Journal of Construction Engineering and Management, 135(11), 1232–40.

Park, M, Ji, S, Lee, H and Kim, W (2009) Strategies for Design-Build in Korea Using System Dynamics Modeling. Journal of Construction Engineering and Management, 135(11), 1125–37.

Park, S H (2009) Whole Life Performance Assessment: Critical Success Factors. Journal of Construction Engineering and Management, 135(11), 1146–61.

Park, T, Kim, M K, Kim, C and Kim, H (2009) Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction. Journal of Construction Engineering and Management, 135(11), 1261–70.

San Cristóbal, J R (2009) Time, Cost, and Quality in a Road Building Project. Journal of Construction Engineering and Management, 135(11), 1271–4.

Wethyavivorn, P, Charoenngam, C and Teerajetgul, W (2009) Strategic Assets Driving Organizational Capabilities of Thai Construction Firms. Journal of Construction Engineering and Management, 135(11), 1222–31.

Zahraie, B and Tavakolan, M (2009) Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets. Journal of Construction Engineering and Management, 135(11), 1162–71.